The foundation under every invoice.

Nothing gets built into the invoice by mistake.

Temel connects your contracts, daily logs, and construction books to the invoices they justify — with guardrails that stop over-billing, missed work, and silent spreadsheet errors before they reach the client.

Built for contractors and subcontractors · Works on any phone · No training needed

Sound familiar?

One wrong cell in the spreadsheet

The payment certificate lives in Excel, and Excel never warns you. A quantity typed once wrong, a formula dragged one row short — and you've under-billed a whole floor or over-billed a client who will remember it. Nobody notices until the money is already wrong.

The diary, the book, and the invoice don't agree

Daily log on paper in the site office, construction book in a spreadsheet, invoice in a Word template. Three documents, three versions of the truth — and reconciling them is a night of work before every billing cycle.

No backup when payment is questioned

Supervision or the client pushes back on a line item. Without dated log entries and measured quantities behind it, the conversation is your word against theirs — and their word is holding your money.

Put your billing on a foundation. ↓

How it works

One chain, no gaps: contract → daily log → construction book → invoice.

  1. Lay the contract as the foundation

    Enter the contract once: line items, quantities, prices, VAT. From that moment it is the single source of truth that every log entry and every invoice line is checked against.

  2. Record the work as it happens

    Daily logs and construction book entries from the site, in minutes. What was done, how much was measured, who was there — each entry lands under its contract item automatically.

  3. Invoice inside the guardrails

    Advance, interim, or final — Temel builds the invoice from measured work. A quantity over the contract? Work billed twice? It gets blocked before it ever reaches the client.

Why Temel

Temel means foundation — and that's the job: the solid layer under your company's money flow. Not another do-everything platform; the contract, the site records, and the billing finally share one brain.

Guardrails, not just templates

The contract value is a hard ceiling. Temel stops over-invoicing, catches double-billing, and keeps VAT correct on every calculation — the mistake is blocked at the source, not discovered at the bank.

The regulated documents, built in

Construction diary and construction book kept in proper form and exported when supervision asks for them. The paperwork the law requires is a by-product of your normal day, not a second job.

From measured work to invoice in minutes

Advance, interim, and final invoices generated straight from the construction book. Line items, quantities, VAT, your numbering — a document a client pays without questions.

A record that ends arguments

Dated entries, measured quantities, signed PDFs. When a payment is questioned, you don't argue — you show the book. Every invoice line traces back to the work that justifies it.

Who it's for

For contractors & subcontractors

If your money moves through contracts, measured work, and payment certificates — and one wrong number can hold up six figures — Temel was built for your week:

  • Every invoice line traces back to logged, measured work under the contract
  • The contract value is enforced automatically — over-billing is blocked, not discovered later
  • Diary and construction book stay in proper form, ready to hand to supervision
  • Advance, interim, and final invoices with VAT handled correctly every time
  • Your site engineer logs a day in two minutes — if they can send a message, they can keep the diary

Start free. Bill every denar of work — and not one more.

The free plan is free for real — no credit card, no trial clock. Upgrade later if your business outgrows it.

Start free

Set up in five minutes. First invoice today.

Questions from the field

How much does Temel cost?

You can start free — no credit card, no time limit on the free plan. When your business grows, paid plans unlock more contracts, invoices, and team seats. You only pay when Temel is already paying for itself.

What exactly does Temel prevent?

The expensive, silent mistakes: invoicing past the contract value, billing the same work twice, quantities that don't match the construction book, and VAT calculated by hand. Every invoice line is checked against the contract and the measured work before it goes out — the guardrail catches the error, not the client.

Does it replace my construction diary and construction book?

Yes. Daily logs and construction book entries are kept in the system in proper form, tied to the contract items they belong to, and export as documents you can hand to supervision. The paperwork stays compliant without a parallel paper process.

Do invoices really come from the logged work?

That's the whole point. Advance, interim, and final invoices are built from the measured quantities in the construction book. When a client asks "what am I paying for?", every line has dated entries and measurements behind it.

Can I export my data?

Always. Invoices export as PDF, and your logs, books, and records can be exported any time. It's your paperwork — Temel never holds it hostage, even if you cancel.

Can my site engineer or office manager use it too?

Yes. Your site engineer keeps the daily log from the field, while you or your office manager handle invoicing from the desk. Everyone works against the same contract, and nobody re-types anything.

From the blog